Decking History View

Yard Decking History Decking History View

Prerequisites

The Decking History view is a view-only table for analyzing decking decisions that have been made by Expert Decking, TZ Decker, or any of the Intra-block decking logic. The Decking History view reflects all decking work instructions that have been dispatched. Manually planned moves are not included.

For more details about a decision, double-click a decking history record to view Decking History Details (on page 1).

To see where a particular decking decision fits within the decking process, see Diagnosing Decking Issues in the online help.

To see the strategy set and penalty values applied for a particular depart mode, see Viewing strategy sets in N4 by depart mode.

For Purging: Decking History records are purged with the unit. See Purge settings for more information. You can also control how long decking history records are retained with ARGOPURGE081 (PURGE_DECKING_HISTORY).

Notes

 

 

Decking History Columns

Short Label

Long Label

Description

In Filter?

Sorting?

Yard Name

Yard

Yard name

X

X

Time

Time

Timestamp of when the decking decision was made.

X

X

Unit Nbr

Unit Number

Container number

X

X

Decking Type

Decking Type

The type of Decking logic used. For full list of decking types, see Decking Types (on page 1).

X

X

Node

Node

N4 node that ran the thread for the decking decision. The format is "ip address{user} - XD server privilege". The XD server privileges are DKRSVR for the ECN4 XD server and XDSRVC for the N4 XD server.

X

X

Container Last Pos

Container Last Position

Original position of container

X

X

To Pos

To Position

Position selected by Decking.

This column is empty when the N4 Intrablock Decker is calculating the position multiple times throughout the Transfer IN process. N4 only displays the last position that is actually selected. When the value is empty, the position for that decking call has not been finalized/selected. 

You can display only those records with actual "To Pos" values by creating a filter with criteria of Phase = Selected.

X

X

Total Score

Total Score

Total penalty score. The total penalty score will not go above 32,767.

 

X

Execution Time

 

Time it took to execute the decking logic.

For twin decking, this includes the overall time taken for the decking call, as opposed to only the last decking call.

 

X

Gkey

Decking History Gkey

Unique ID for the Ufv's decking history.

X

X